Last edited by Jubei
Monday, May 4, 2020 | History

3 edition of Crown Jewel Mine, draft environmental impact statement found in the catalog.

Crown Jewel Mine, draft environmental impact statement

Crown Jewel Mine, draft environmental impact statement

  • 298 Want to read
  • 31 Currently reading

Published by TerraMatrix in Steamboat Springs, CO .
Written in English

    Subjects:
  • Crown Jewel Project,
  • Gold mines and mining -- Environmental aspects -- Washington (State) -- Buckhorn Mountain Region (Okanogan County),
  • Environmental impact analysis -- Washington (State) -- Buckhorn Mountain Region (Okanogan County),
  • Buckhorn Mountain Region (Okanogan County, Wash.) -- Environmental conditions

  • Edition Notes

    Other titlesDraft environmental impact statement, Crown Jewel Mine, Okanogan County, Washington
    Statementprepared by U.S.D.A. Forest Service, Tonasket Ranger District [&] Department of Ecology, Washington State.
    ContributionsTonasket Ranger District (Wash.), Washington (State). Dept. of Ecology., TerraMatrix Inc.
    The Physical Object
    Pagination3 v. :
    ID Numbers
    Open LibraryOL14480418M
    OCLC/WorldCa32966643

    Carmichael Coal Mine and Rail Project 41// Volume 1 Section 4 Social Impact Management Plan Based on the outcomes of the workshops, Action Plans were developed for each of the priority impact areas and compiled into the draft SIMP report. NEW LIBERTY GOLD MINE (NLGM) PROJECT ENVIRONMENTAL IMPACT STATEMENT (EIS) June Report No. GHA ¡ Construction Phase: Approximately personnel with approximately 65% Liberians; and ¡ Operational Phase: Approximately personnel will be employed within the mining operations. Approximately 80% of these will be Liberians, which will comprise of skilled, semi-skilled .

    An environmental impact statement (EIS) is a document that describes the local environment, the proposed project, its potential impacts on the environment, and possible mitigating measures, and outlines proposals for the decommissioning and remediation of the project. Environmental Impact of Mining and Mineral Processing: Management, Monitoring, and Auditing Strategies covers all the aspects related to mining and the environment, including environmental assessment at the early planning stages, environmental management during mine operation, and the identification of major impacts.

    New Slag Dump Project Draft Environmental and Social Impact Statement ix September Declaration of the Authenticity We, Konkola Copper Mines lc, the undersigned, declare that the contents of this Environmental P and Social Impact Statement (ESIS) reflect the available information at the project site and within the broaderFile Size: 1MB. Draft Environmental Impact Statement/Environmental Impact Report S-3 Executive Summary Metro is the lead agency for the California Environ-mental Quality Act (CEQA). This Draft EIS/EIR defines the Purpose and Need of the Project and describes and evaluates the alterna-tives, including a No Build Alternative and a rela-File Size: 2MB.


Share this book
You might also like
Romanov relation

Romanov relation

Riemann problem and interaction of waves in gas dynamics

Riemann problem and interaction of waves in gas dynamics

RACER # 3580220

RACER # 3580220

The arterial pattern of the tunica mucosa of the utrus in Macacus rhesus ...

The arterial pattern of the tunica mucosa of the utrus in Macacus rhesus ...

People and places of Cornwall and various other verse.

People and places of Cornwall and various other verse.

To improve the academy

To improve the academy

A-Z of Careers and Jobs

A-Z of Careers and Jobs

Complementary satellite sound broadcasting systems

Complementary satellite sound broadcasting systems

ring of willows

ring of willows

Facts for Consumers Credit, Credit and ATM Cards: What to do if Theyre Lost or Stolen, June 1997

Facts for Consumers Credit, Credit and ATM Cards: What to do if Theyre Lost or Stolen, June 1997

Lets See Pop-Ups

Lets See Pop-Ups

Tōrā in the Old Testament

Tōrā in the Old Testament

Crown Jewel Mine, draft environmental impact statement Download PDF EPUB FB2

Draft Environmental Draft environmental impact statement book Statement Crown Jewel Mine Okanogan County, Washington June Lead Agencies: U.S.D.A. Forest Service - Okanogan National Forest Washington State Department of Ecology Cooperating Agencies: U.S.D.I.

Bureau of Land Management U.S. Army Corps of Engineers Washington State Department of Natural Resources Responsible Officials: Mr. Sam Gehr, Forest. DB Lead Agencies: U.S.D.A. Forest Service DRAFT ENVIRONMENTAL «—-»•» IMPACT STATEMENT Department of Ecology TON STATE E'C'O'L'O'G'Y JUNE CROWN JEWEL MINE Okanogan County, Washington VOLUME II Assembled By: Engineering * Enwlronmwttal S*rvlcM.

Draft Environmental Impact Statement Flambeau Mining Inc. -Copper Mine Ladysmith, Wisconsin [D.] on *FREE* shipping on qualifying offers. Draft Environmental Impact Statement Flambeau Mining Inc.

-Copper Mine Ladysmith, WisconsinAuthor: D. The Draft Environmental Impact Statement analyzes the potential environmental impacts that could result from the continued mining and expansion of the Red Rock and Top Zone pits, mining of two new pits (5-North and 8-North), new Crown Jewel Mine leach facility, heap leach pad expansion, new waste rock dumps, waste rock dump expansion, tailing impoundment.

Draft Environmental Impact Statement for the Rosemont Copper Project. A Proposed Mining Operation, Coronado National Forest, Pima County, Arizona Affected Environment and Environmental Consequences, Volume 2 [Download PDF, 15mb, pages] Appendix A. Executive Summary of the Mine Operations Plan; Appendix B.

U.S. Army Corps of. RE: Elk River Landfill Expansion – Draft Environmental Impact Statement The Minnesota Pollution Control Agency (MPCA) has prepared a Draft Environmental Impact Statement (EIS) on a proposal by Elk River Landfill, Inc.

(ERL) to construct a horizontal landfill expansion at its existing site in the city of Elk River, Sherburne Size: 1MB. Full text of "Draft environmental impact statement Golden Sunlight Mine" See other formats.

Final Environmental Impact Statement. DRAFT EIS (See bottom of link) Application Documents. April 9, Ma March Barretts Mineral, Inc., Regal Mine Expansion, Madison County: Record of Decision Press Release Final EIS Cover Letter Final Environmental Impact Statement Draft EIS Cover Letter Draft Environmental Impact.

Montana Department of Environmental Quality. Date: Septem Dear Interested Party: The Montana Department of Environmental Quality (DEQ) has completed a Draft Environmental Impact Statement (draft EIS) for a proposed amendment to Operating Permit No.

issued to CR Kendall Corp. for the CR Kendall Mine. Ł Comments and Responses on Draft Environmental Impact Statement Guide to This Final Environmental Impact Statement This Final Environmental Impact Statement is in three volumes.

Volume I: Ł Chapter 1. Purpose of and Need for Action Ł Chapter 2. Alternatives, Including the Preferred Alternatives Ł Chapter 3. Affected Environment Ł Index.

Crown Jewel Mine decision: Hearing before the Subcommittee on Forests and Public Land Management of the Committee on Energy and Natural Resources, first session J (S.

hrg) [United States] on *FREE* shipping on qualifying offers. Final National Mall Plan/Environmental Impact Statement, National Mall and Memorial Parks Washington, D.C. () (pdf) Lafayette Park: Historical Research Series Number 1 () (pdf) Legislative History of National Capitol Parks and Descriptions of the Seventeen Original Reservations (pdf) Lincoln Memorial: Cultural Landscape Report.

Baffinland Iron Mines handed in a Draft Environmental Impact Statement for its proposed $4 billion Mary River Iron Ore mine in January, in which it predicts what the impacts of the mine will be on. U.S. Steel Keetac Taconite Mine Expansion Project Draft Environmental Impact Statement December Author: Minnesota Department of Natural Resources and the U.S.

Army Corps of Engineers Subject: Figure Created Date: Z. FARMINGTON — A page document outlines the potential impacts of extracting coal from the San Juan Mine through or closing the mine next year. The federal Office of Surface Mining Reclamation and Enforcement is gathering public comments on the draft Environmental Impact Statement that was released May Author: Hannah Grover.

Supplemental Draft Environmental Impact Statement (SDEIS) Executive Summary NorthMet Mining Project and Land Exchange. EXECUTIVE SUMMARY. ES NOVEMBER processes and describe mitigation measures that may be available. NFS lands are owned by the United States of America and administered by the USFS, within the U.S.

Department of. Subject: EPA Comments on the Four Corners Power Plant and Navajo Mine Energy Project Draft Environmental Impact Statement, Navajo Nation, San Juan County, New Mexico (CEQ # ) Dear Mr. Calle: The U.S. Environmental Protection Agency File Size: KB. USDA Forest Service.

Crown Jewel Mine: Administrative Record: Section Hydrology Final Reports (Water Quality Baseline Data, ). AR# Okanogan Valley Office, Okanogan. Washington State Department of Ecology. Buckhorn Mountain Project: Final Supplemental Environmental Impact Statement.

Yakima, Size: KB. Despite an absence of support from the EPA, the proposed open-pit Pebble Mine Project in Southwest Alaska refuses to die. In the latest major action, the U.S.

Army Corps of Engineers (Corps) announced that it will prepare a Draft Environmental Impact Statement (DEIS) based on an application for a Clean Water Act (CWA) Section (dredge. The proponent shall ensure that the proposal is implemented in accordance with the environmental commitments and safeguards identified in the Rustler's Roost Mining Pty Ltd draft Environmental Impact Statement, or as modified in the Supplement to the draft EIS, this assessment report or an approved Mine Environmental Management Plan.

Ochoa Mine Project Draft EIS BLM Carlsbad ICP obtained federal and state permits to prospect and explore for potassium minerals in Lea and Eddy counties, New Mexico, outside the SPA. Although the mining methods would be similar, t he proposed Ochoa Mine is a departure from the potash mining in the SPA because ICP proposes to extract the.Positive environmental impacts of sand and gravel mining worldwide 21 Negative environmental impacts of sand and gravel mining worldwide 24 Solutions and mitigation measures to sand and gravel extraction worldwide 31 Summary 37 CHAPTER THREE: RESEARCH METHODOLOGY .Ochoa Mine Project Final EIS BLM Carlsbad R-1 References Abel, J.

F., Jr. Rock Mechanics Mining Review, report prepared for Trigon Exploration, Utah, Inc., Aug AECOM. Environmental Geology Assessment Report for Issues Related to the Proposed Ochoa Mine, Lea County, New Mexico. Written by W.